ORC Power System
Site Survey
After the preliminary analysis of power generation availability and investment probability, to gain more insight about the situation on-site, Hanpower engineers need to conduct a site survey and discuss with customers about the details of the design and the interface:
● Range of variation of the heat source condition (flow rate, temperature)
● Range of variation of the heat sink condition (flow rate, temperature)
● The composition and corrossiveness of the fluid on heat source
● The composition and corrossiveness of the fluid on heat sink.
● Direct or indirect heat extraction.
● The need for heat dissipation on the heat source of the manufacturing process.
● The space limitation for the ORC Power system
● The position of the ORC Power system and the relative position of heat source and heat sink.
● System: Outdoor type or indoor type
● Whether the gas in the atmosphere is corrosive
● Whether the installation site is explosion-proof.
● The need for connection to the power grid
● To Sell or keep the electricity
● The integration of the ORC power system and the environment control system
● Remote monitoring interface for the status of the system
● The need for heat insulation and painting for the facility.